Free Floating Trebuet Plans

13.06.2007 - The interior work begins!

Almost as soon as the day before, the day the House of Assembly moved the finger-house staff and began with the replacement of the roof . In this work, the column workers were a colossal challenge. Our selected brown clay tiles are larger than traditional brick and is many times more difficult - a clay brick weighs up to seven kilograms. This fact and the extremely warm weather did not detract from those employed by home-finger had been working for almost usual professional and determined. At half past twelve the entire roof was covered with bricks . Almost unthinkable!

then they started on the interior: insulating the roof slopes and dressing up with engineered wood and plasterboard. Here, too, showed that the finger-house staff, this is not the first time made. At what speed and accuracy with which the did it, we could really sit and watch for hours .

From time to time also the electrician ran with his colleagues past us. The subject is still their cables through the walls and floor ceiling and the roof slopes. Here too, we should have never dreamed that the electrician has completed on the first day after the local assembly of its work fast. It's really everything fast furious.

0 comments:

Post a Comment