Friday, September 17, 2010

Time Warner Landline Phone

sampling over!

After the samples are now, first a big thanks to Mr. H. has led us through the great samples and has to stand by us in all matters with his expertise. In total, the sampling was very pleasant and never degenerated into hectic.

We are a day earlier traveled to us first to recover from the trip and to take schonmal a few hours in the exhibition a few choices. The next day we went and we were going quite quickly. Only with the flow and choose the wallpaper we had a little longer, there was no time for this the day before. At noon, we can then bring us first pizza. The next day we went continue with the electrical installation planning. As we do that but in-house service here was really just to determine where the holes hinmüssen.

Here are a few things we have discarded:

  • All sanitary items and fittings (we buy on the Internet)
  • electrical installations


Situated screened, we have the following:

  • flow (almost) the whole ground floor
  • WK 2 in the house for doors and windows
  • UniTerm


We also now have the dates for the next steps will get:
Keller plans come in the week 50
basement is finished in the KW 6
house is set up for week 10

Friday, September 10, 2010

Funny Email Confidentiality Statement

The sampling may

we have now received our sampling date in writing! We are of 14 to 16 September in the Ratsschänke in Frankenberg to stay.

Tuesday, September 7, 2010

Buy Flamin Hot Cheetos Uk

cellar stairs must go

Since our basement must be designed as a "bath tub" would be caused immense additional costs of the basement stairs because we wanted to drain the rain water through a drain in the floor and a roof is not an option .. Therefore, we have now but decided to cancel the basement stairs easily. This saves a lot again, what comes to us for sampling next week probably good. ;-) Instead of the stairs we
a waterproof waist can be fitted.

Thursday, September 2, 2010

Tropical Exterior House Illustrations

planning application

Today was a huge package of paper with finger-house in the mailbox. The planning application alone, in triplicate, and even applications for sewage and water. All signed and tomorrow morning, the package is sent to the community.

We have also made us a little smart because of the quality assurance and leave us a couple of offers, as passed by the DEKRA. The pass three times (after Keller-base, after the body shop and handed over at the end) Let's see who we decide! Is important to us in any case, some "idea" that not FH works with the boat to have.