Sunday, January 24, 2010

Measurements For Luggage

sauna ready

After the last few days the feeling of a real construction site had including the whole mess and the fact that everything was full of tools and materials, our sauna yesterday finished.

Presumably we will be inaugurating the sauna today. Fits this has again started to snow. Here are some pictures ...


Thursday, January 21, 2010

How To Get Pregnant On Fantage

sauna in the building

On Tuesday, the sauna was delivered. We are building on strong. On weekends, they would have to be ready. Then you can dance in our bathroom is no longer too! ;-)

And then there are pictures for you! :-)

Sunday, January 17, 2010

Tennis Games Nintendo Wii

advantage of a tank - most recently

We had at that time this post added with different views on the subject tank. Before, when I was home the last 300m was jogging, I saw how the workers and the master water at a Water pipe break struggled. The water gushed out everywhere
from the ground and basis of the conversation was to recognize that the problem could not be solved so quickly. In short, I learned that it would be possible that is set down for the entire settlement soon the water.
home made quick shower and let out 10 liters of drinking water as a stock. In principle, we are now until the next shower (and if necessary, so that should suffice in 2 days still) pretty self-sufficient water.
Besides cooking and showering, we can all operate from the well. And in the worst case, there's halt 'ne snow shower and the cistern water is boiled! ;-)
Now even an emergency generator with three-phase connection and we had actually self-sufficiency.
Economically, the emergency generator is perceived at 5 min power cut per year is not certainly worthwhile. But it's good to know how and that might be.

Friday, January 15, 2010

Branded Thin Client India

dripping pipe stops dripping

On Tuesday Baywa and Bierstorfer was there. Bierstorfer has removed the kitchen - or better say partially dismantled. Then Baywa trying to find the leak. At the end had to be sharpened about 50 cm distance free and the whole tube was removed with the drill bit. It was then laid fresh with new seals and hopefully will now stay tight.
missing is the installation of air valves and the new calibration of the ventilation system, then the conclusion of Baywa come.
And then we are slowly but surely also the official end of this construction diary.

Sunday, January 10, 2010

Pepperidge Farmskilled

installation disk optimized again

possessions in the meantime installation channel concerned, thus optimizing the network headquarters. Looks easy from now clean.

Saturday, January 9, 2010

Automatic Homemade Rabbit Feeder

snow cheap leave

If any ski area has enough snow ... we would have to be cheap from what.

Sunday, January 3, 2010

How Much Does Haro F1c 2010 Weigh

workshop finished up

The last days I was not lazy and I have the workshop is now fully equipped. The partition is ready (primed and painted), the shelves are bolted and ran the tools already hanging. The 2nd
Cabinet is assembled and also the wall unit is mounted.
is aufgrÀumt And also!

In the summer just have the bottom paint can be applied.

I can potter about in the future, nice! :-)