21.06.2007 - "WPL13 in operational status!

days earlier, the finger-house mechanics had the air / water heat pump is not connected to the same one hundred percent ready, because it was still put into operation. were now the masters of the ENWOR again here and ensure the correct installation of individual tubes checked in the equipment room. Only when the gave their okay, the mechanics of finger home-made and connected to work at the air / water heat pump completely. Would have also been contracted effort, if that would have had to complain of the ENWOR something and the finger-house staff do all the work would again have to backtrack. After connecting the system was then ready for operation, but was not yet fully activated.

parallel to the work in the building equipment room were also placed in the other rooms, the heating coils for the floor heating, and is now was no longer an issue for the finger-house technicians. All ready connected and ready for the floor.