Building A Beer Pong Table Basketball

05/07/2007 - heating runs, external plaster is prepared interior is primed!

First we need to despatch on something from yesterday. For when we wanted to close the evening the house and letting down the blinds, because we could not believe our eyes. on our house and the facade were already working the cleaner. Well, they just started the preparatory work - filling, cleaning of dirt and adhesive residues etc. From morning Our hotel is in then a little color - the color plaster.

We were really surprised positively, particularly since we had not told our supervisor that advance the cleaner already (it was previously but was still with us at the Bastelle) - we previously of the 28th Week is assumed.


After that cleared up everything and we had the "bad idea" to take back, because our supervisor told us on several occasions spoken to the mailbox, because he had forgotten to mention this to the whole talk with us, but the mobile phone Axel not ring anyway as it was in his pocket, but the battery had given up the ghost. And ultimately, was the former arrival of the cleaning crew so even more of a blessing for us (the sooner we can start later!).

have the heating engineers, as yesterday announced today taken the heating in the operation . As we expected any problems were detected and the system is running now for almost twelve hours. She is currently on the program for drying screed set and will take some days until the construction manager can determine the desired degree of drying.


Also in the house today were the mechanics of finger-house take on the thankless task of filling the walls, ceiling and roof pitches for us. When we locked the house, shortly after nine this evening, as was the entire top floor already unrecognizable little. All very clean smoothed , even the shock hits (wall on basement ceiling) are in carefully filled. It even looks like this just to start thinking seriously about it, emphasize the ceiling and not only to paper about. Let's see! We expect that the installers finished fill the floor tomorrow, perhaps next week and will then again have to grind down the points all joints.