Wednesday, December 2, 2009

Automatic Rabbit Watering System Homemade

preparation for paving of the footpath

gerackert Today I'm as stupid. I have prepared for the paving of the walkway. But that was far more difficult than planned. Our walk to start an approximately 7m long climb at around 16%. Due to the rain the last days was the ground but probably completely soaked. It took me almost an hour to the 250kg heavy vibration plate as to bring up - and after that I looked like a Sr. .. The plate has generated and over again by shaking in a mud hole - and then lost it! :-( You would not believe how much water from a non-acting really wet surface can be pressed by means of brute force out .....! After the swamp soil with sand and then split for the first time dry I could condense it down was good. Then I have set the foundations for the path lighting and a further 1.5 tonnes Subbase taken, distributed and also compacted.

picture of the finished walk after the weekend I hope to be able to put online.