24.05.2007 - decrease in the floor plate to finger house!

on 24.05.2007 stood before the decrease of the base plate. We were so anxious to see if the drive would be removed without major defects. The construction manager of finger-house came despite a traffic jam on the A61, on time for our appointment to the job site .

After the obligatory welcome and brief introduction, he set to work at once. View-measure plans, take levels, etc. He explained to us very quickly what was going on. The base plate dimensions were one hundred percent compliance by us and implemented correctly been . pity that he had the low water accumulation in the center of the bottom plate, as feared by us.

But he nevertheless praised us for the great work that we had delivered on their own performance - Without any real knowledge ('re not a professional)!

For the small hollow in the floor plate, he also had a solution for the same and that is in the house installation or later when the floor is a little more down to insulation in the appropriate area. He assured us that this is really only a very small hollow and we would have to make us not worry here would be caused by the rain completely normal.

The last information he told us that our house likely in the 24th Week delivered in 2007 and installed will . In the same breath, he pointed us out that we have the crane Pitch would have to create - the place where he should come to stand, he showed us how well the parking area for the clay, which is about 1-2 days to be delivered before the House Assembly. Most importantly, the Dixi toilet is left to stand by the crane and also delivered a few days earlier.

now is put the "homework" to work and contact the site manager as soon after the settlement.